4D planning. 5D cost intelligence. Reinforcement and clash coordination. Critical-path, delay and earned-value controls—connected through a governed, AI-assisted project workflow.
Model + work package
Link each package to coordinated model information, responsibilities and release criteria.
A revised model is not just a design event. It can change quantities, procurement, sequence, access and forecast cost. We connect those consequences to the people who can act.
01Model element
02Location + WBS
03Schedule activity
04BOQ + cost account
05Site evidence
06Reviewed decision
Integration basis: source-namespaced element IDs, location, work breakdown structure (WBS), activity and cost-account mappings; versioned model, baseline and a common reporting cut-off. Unmatched records stay visible.
Owner / PMO / THE DECISION
What needs a decision before it moves the milestone?
Connect the evidence
Baseline, change register, cost forecast and approval log
AI assistance to configure
Assemble an evidence-linked decision brief and flag missing approvals.
Human authority
The project director authorises scope, budget and recovery decisions.
02 / 4D PLANNING & CRITICAL PATH
See the sequence. Test the consequence.
Link model selection sets to a logic-driven programme. Review workfronts, temporary works, procurement and hold points—not only an animation of permanent works.
WORK PACKAGE / SEQUENCE LABIllustrative data · not live project results
A → B + C in parallel → D → E
A Design release
4d
Driving
B Rebar fabrication
6d
Float
C Plant / access readiness
8d
Driving
D Installation package
5d
Driving
E Inspection / release
2d
Driving
Day 0102030
Gold = driving path · Cyan = available float · Vertical line = preview day
ASequence complete
BIn sequence
CIn sequence
DNot started
ENot started
Calculation basis & 4D delivery checks
Hypothetical unresourced network from day 0, one common working-day calendar, finish-to-start relationships, no lags or constraints. A = 4d; B = 6d and C = 8d start after A; D = 5d waits for both; E = 2d follows D. Recalculate from the longest branch. This is a sequence diagram, not a model viewer or a project forecast.
For delivery: validate model-to-activity links, unlinked scope, calendars, actual dates, remaining durations, near-critical paths, logistics and inspection prerequisites. Keep the approved baseline separate from updates and scenarios.
03 / 5D COST & QUANTITY TAKEOFF
A model change. A traceable cost consequence.
Connect measured quantities to work items, rates, cost accounts and the programme. Reconcile the model with the bill of quantities (BOQ), including exclusions and non-modelled work.
QUANTITY → RATE → PACKAGE VALUEIllustrative data · not live project results
Illustrative package quantities and unit rates in INR; not a quotation.
Work item
Quantity
Rate / unit
Amount
ConcreteNet model volume; openings and duplicate hosts checked.
100 m³
₹6,500
₹6,50,000
ReinforcementReviewed bar schedule mass; laps and couplers follow approved details.
Quantity × rate only. Illustrative rates, no price date; excludes GST, waste, preliminaries, escalation and other scope. Not linked to the separate EVM example.
Measure
Element-level takeoff, units, measurement rules and model revision.
Reconcile
BOQ mapping, duplicates, openings, exclusions and manual allowances.
Control
Revision delta, cost owner, rate basis and approved change record.
04 / REINFORCEMENT & COORDINATION
Buildable information. Not just a clash count.
Reinforcement modelling and coordination need an explicit design basis, modelling responsibility and acceptance check. Model detail alone is not structural approval.
REINFORCEMENT MODELLING
From approved detail to coordinated bar information.
Bar marks, diameters, shapes, spacing, cover, laps, anchorage and couplers are modelled against engineer-approved details. Coordinate openings, embeds, construction joints and congestion before issuing the agreed package.
Inputs
Approved structural details, revision, grade, cover and project detailing standard.
Model & schedule
Rebar sets, bar bending schedules (BBS), shape/count/length checks and revision comparisons.
Release gate
Structural engineer reviews design intent; modeller and checker reconcile schedules. Fabrication release follows the appointed approval process.
Clash detection framework — project-specific tolerances and priorities must be agreed.
Test pair
Conflict type
Review rule
Structure × MEP
Hard intersection
Check openings and design intent; assign to the responsible designer.
MEP × MEP
Hard / clearance
Review routing, insulation and installation space against project rules.
Equipment × access
Maintenance clearance
Verify service envelopes, removal routes and operator requirements.
Rebar × embeds
Congestion / constructability
Review bar arrangement, cover, openings, couplers and pour access.
REQUIRED EVIDENCE
Detect
Federated revisions, coordinates, element IDs and rule set.
Measure high-risk open issues, ageing, recurrence and verified closure—not only raw clash totals. A closed issue is not blanket proof that the model is clash-free.
05 / EARNED VALUE MANAGEMENT
Progress, cost and time. In the same review.
Earned value management (EVM) connects budgeted work with verified accomplishment and actual cost. Use the same scope, accounting cut-off and agreed rules of credit.
PERFORMANCE REVIEW / HYPOTHETICAL CONTROL ACCOUNTIllustrative data · not live project results
PVPlanned value
₹72L
EVEarned value
₹60L
ACActual cost
₹78L
Budget at completion (BAC): ₹120 lakh. Planned value (PV): ₹72 lakh. Actual cost (AC): ₹78 lakh, including assumed accruals. Values are held at one hypothetical reporting cut-off.
COST PERFORMANCE INDEX0.77CPI = EV / AC
Earned value is below cost incurred.
SCHEDULE PERFORMANCE INDEX0.83SPI = EV / PV
Less budgeted work earned than planned.
CV = EV − AC₹-18.00 lakh
SV = EV − PV₹-12.00 lakh
EAC sensitivity = BAC / CPI₹156.00 lakh
SV is a value variance, not days of delay. SPI does not replace critical-path analysis. EAC here assumes current cost efficiency continues; a delivery forecast needs a reviewed bottom-up estimate to complete, commitments and risks. Undefined denominators must be reported as unavailable.
06 / DELAY ANALYSIS & RECOVERY
Explain the movement. Preserve the evidence.
A delayed activity and a delayed completion are not the same finding. Establish the event, the contemporaneous schedule state and the path to the affected milestone.
01
Record the event
Preserve notices, instructions, RFIs, access records, inspections and dated site evidence.
02
Validate the schedule
Check baseline/update revision, data date, calendars, logic, actuals and calculation settings.
03
Trace cause to effect
Select time-impact or window analysis to suit the contract, records and assessment question. Keep before/after models.
04
Test the response
Compare mitigation and recovery options against resources, procurement, workfronts, cost, safety and quality.
Technical support. Not automatic entitlement.
Assess float consumption, path changes and parallel events. Overlapping dates alone do not establish concurrency. Extension of time, responsibility and compensation depend on the contract and authorised professional review. AI can assemble records; it does not determine liability.
07 / AN AI-ASSISTED PROJECT CONTROL LAYER
Let AI find the connection. Let people own the decision.
The service is to design and implement a governed integration around your project systems. This website demonstrates that architecture; it is not a connected production platform.
01 / CONNECT
Models + records
Authoring models, Autodesk Forma/CDE, schedule exports or APIs, cost systems and site reports.
02 / RECONCILE
A trusted data layer
Validate versions, IDs, units, calendars, quantities and cost totals; quarantine missing or conflicting records.
03 / ASSIST
Evidence-linked AI
Retrieve project context, cluster issues, flag anomalies and draft change or risk narratives with source references.
04 / REVIEW
Professional judgement
Planner, BIM lead, QS and project manager validate conclusions, confidence and missing evidence.
05 / AUTHORISE
Controlled action
Approved issues, reports and decisions return to the nominated system of record with permissions and an audit trail.
06 / LEARN
Measured improvement
Evaluate errors, reviewer corrections, adoption and decision turnaround. Improve rules and prompts against a reviewed test set.
The boundary is part of the engineering.
Deterministic calculations handle schedule logic, quantities and EVM. AI assists interpretation and drafting. No automatic design approval, fabricated progress, baseline changes, payment certification or contractual determinations. Access, licensing, API availability and project permissions are assessed before integration.
Less disconnected work
Test whether teams can trace a decision back to the model, schedule and supporting record.
Earlier, clearer exceptions
Track constraint age, unresolved interfaces and review turnaround against an agreed baseline.
An operable handover
Deliver mappings, validation rules, dashboards, ownership, training and a support plan.
START WITH ONE CONTROLLED PACKAGE
Connect the model. Strengthen the delivery system.
Begin with a scoped discovery: one package, one reporting cut-off and the decision you need to improve. We define the mappings, delivery outputs, review gates and acceptance criteria before scaling.
Bring
Model / IFC sample, programme, BOQ, cost-code structure and representative progress records. Share only through an agreed secure channel.
Define
4D links, 5D quantity rules, coordination tests, performance measures and the AI assistance boundary.
Accept
Reconciled pilot outputs, accountable reviewers, documented exceptions and an agreed deployment scope.