← Project portfolioINDORE / MADHYA PRADESH

INSTITUTIONAL / PROJECT DOSSIER

District Court,
Indore.

A civic landmark.
An intricate system of spaces.

Explore the project ↓
169courtrooms
in the report’s room schedule

Architectural rendering · supplied Site Report, p. 5 · not a completed-site photograph

THE PROJECT / PIPLIYAHANA

Scale is the beginning.
Clarity is the work.

The report describes the balance work of the New District Court Building at Pipliyahana, Indore—a judicial complex with a main building, a service building and supporting campus infrastructure.

Its cover identifies the Executive Engineer (Building), PWD, Indore, M.P. This dossier presents the supplied project information; it does not establish Infralytica’s contractual appointment, completed scope or measured outcomes.

169courtroomsRoom schedule · pp. 6–7
56advocate hallsService programme · pp. 9–10
829four-wheelersParking schedule · p. 11
1,210two-wheelersParking schedule · p. 11

02 / THE COURTROOM ATLAS

169 rooms.
A legible system.

Explore how the report distributes courtrooms across nine upper floors and blocks A–J. Each selection reveals the schedule—not an invented model or live occupancy feed.

FLOOR 0422

courtrooms across 9 blocks

BLOCK A4courtrooms
BLOCK B1courtrooms
BLOCK C2courtrooms
BLOCK D2courtrooms
BLOCK E—none scheduled
BLOCK F4courtrooms
BLOCK G2courtrooms
BLOCK H2courtrooms
BLOCK I4courtrooms
BLOCK J1courtrooms

Source: Site Report, pp. 6–7. Diagram expresses the schedule, not physical block positions. Basement and ground floor have no courtrooms listed.

Inspect the complete floor × block register
Courtroom schedule · Site Report, page 7. Dashes in the source are represented as zero.
BlockF1F2F3F4F5F6F7F8F9Total
A44444444436
B1111111119
C22222222218
D11222222216
E0000000000
F04444444432
G01022222213
H02122222215
I00044444424
J0001111116
Total81514222222222222169

03 / ONE CAMPUS · COMPLEMENTARY PROGRAMMES

Justice at the centre.
Support around it.

The main and service buildings carry distinct programmes. Reading their capacity, circulation and support systems together makes the scale of coordination visible.

The judicial building

The room schedules describe the judicial programme across nine upper floors, supported by circulation, records and specialist rooms.

¹ Judge’s chambers as listed on page 6; the sanitation schedule uses a different chamber-toilet count.

courtrooms
169
judge’s chambers¹
169
staircases
15
lifts
13

ACCESS & ARRIVAL / PAGE 11

A schedule of movement.

Parking counts shown by vehicle class and building. The detailed schedule differs from the embedded site-plan total; it is not an occupancy or statutory-compliance claim.

Four-wheelers607 / 829 campus schedule
Two-wheelers830 / 1,210 campus schedule

04 / THE SPACES BEHIND THE PROGRAMME

Beyond the courtroom.

Records, support rooms and building services are part of the same information system. Their identifiers, locations and requirements need to remain traceable through delivery.

Main-building support rooms · Site Report, p. 8. Areas are transcribed in m²; paired values remain separate as reported.
Room typeCountLocationReported area(s), m²
ADR rooms2First floor250.38 / 376.89
Record rooms2First floor22.50 / 517.61
Meeting room1First floor87.57
Malkhana rooms2Second floor178.09 / 248.04
ADR record room1First floor24.31
06

rainwater-harvesting units

The campus utilities schedule lists six RWHP units.

08 + 04

sump wells

Eight in the main building and four in the service building.

04

service-building staircases

Supported by four 16-person lifts; the report also lists 16 common toilets.

Sources: pp. 6, 9–11 and 13. Domestic, grey-water, fire-water and overhead tank systems are listed in the report; capacity units require confirmation.

05 / THE INFORMATION CHALLENGE

Many rooms.
Many interfaces.
One connected understanding.

For a programme of this scale, a room register becomes a coordination reference: block, floor, discipline, work package and acceptance evidence. This is the bridge between understanding the asset and controlling its delivery.

Explore our BIM project-management approach ↗

Service approach—not a claim that the BIM, 4D, 5D or AI workflows shown elsewhere were deployed on this project.

06 / SOURCE TRANSPARENCY

Every figure has a basis.

Source: the user-supplied, 13-page Site Report. No verified issue date or as-built certification is established. The following differences remain visible rather than being silently resolved.

Courtroom reference

The embedded site-plan title refers to 167 courtrooms. Pages 6–7 independently total 169.

Publication treatment: 169 is presented as the room-schedule total, not a certified as-built count.

Parking basis

The site-plan schedule states 1,894; page 11 gives 829 four-wheelers and 1,210 two-wheelers.

Publication treatment: The page 11 vehicle-type schedule is shown with attribution. The two bases are not combined.

Building areas

Main-building construction/plinth values and their dimensional/unit conversions are inconsistent.

Publication treatment: No total built-up area or derived site-area KPI is promoted.

Advocate seating & area

Pages 9–10 use conflicting area/capacity descriptions. The stated 2,976 persons does not reconcile with the accompanying 56 × 372 expression.

Publication treatment: Hall count and floor distribution are retained; seating capacity and hall-area totals are withheld.

Main-building toilets

Page 6 states 279; page 12 totals 295 with a different breakdown. Floor-level labels also differ.

Publication treatment: No single main-building toilet total or unified elevation schedule is asserted.

Water storage

Page 11 labels tank capacities in KLD, although storage is a volume; aggregate interpretation requires confirmation.

Publication treatment: System types and six rainwater-harvesting units are shown, without relabelling or certifying tank capacities.

Earlier portfolio cost and completion-date claims are not repeated in this dossier because this report does not substantiate them. Figures describe the project, not Infralytica fees, savings or delivered results.

FROM PROJECT COMPLEXITY TO A DEFINED SCOPE

Your project.
Connected from the start.

Discuss your project ↗Return to all projects ↗

Continue the journey

The evidence

Useful, owned and still working after we leave.